Skip to content

July 2025 Tomorrow Lists

2025-07-24

  • Collect plastic kištas from preša and skedenj; bring to attic for use for storing canning jars.
  • Get started on Bottle750 kište: e.g. prepare stock for thin slats, e.g. denail and stack in box.
  • Add Gaia-related notes for kišta dimensions accessible on EliNotes
  • Repeat the drill of how much JabSok750 and JabSok330 do I have total, and how much is for home use and how much for Gaia.
  • Pictures of new apples: sentjakobka, far hill
  • Validate ripping a fosen
  • Plan out Burt's workflow: ingredients needed, where to store (e.g. in a kišta); double-boiler setup for preparing; jars for filling; notebook for recording recipes and observations; masking tape for IDing batches for R&D

2025-07-25

  • Clean skedenj hay to big bags
  • Draft message to Matevž
  • Review message to Žan
  • Call Srečo/Nada to arrange next week meeting
  • Storage area in attic for tea bags and bottle caps
  • Purchase Jysk boxes
  • Prototype de-labelling setup: staging crate in miništala; pot in štala by sink; vap to clean interior in štala by sink; drying crate in štala
  • Cut posts and 3x5 slats for e.g. 10 kištas: so 40 posts and 40 slats; place pieces in dedicated boxes and label.

2025-07-26

  • Complete lingering items from previous days
  • Complete transfer of JabSok to MiniŠtala

2025-07-27

  • Process apple-on-tree pictures
  • Process apple pictures
  • Set up apple file structure where each apple has a flower/tree and a fruit picture
  • Solve locally-hosting static sites on EliServer
  • Solve locally-hosting Laravel apps on EliServer

2025-07-28

  • Rename PiAmbient to EliServer at LJ16
  • Set up friction-free workflow for deploying static sites EliServer
  • Deploy EliNotes to EliServer at LJ16
  • Figure out seeding EliMusic database on EliServer at LJ16
  • Bauhaus electrical shopping list.Bauhaus shopping trip.
  • Meet Srdjan to discuss project
  • Remove old switch doza in hallway office

2025-07-29

  • Gaia update books through 2025 Q2
  • Gaia submit DDV-O
  • Deposit USD to TRR
  • Live EliMusic on EliServer at LJ16
  • Purchase IJPP pass
  • Hallway office: cut out space for new doza
  • Prepare with-car.md list of items to buy/transport with car, e.g. for TV47/Gaia

2025-07-30

  • Detail TV47/Gaia pre-sales infrastructure/facilities improvements, with vision/walkthrough of what the friction-free bottling/labeling/packaging workflow will look like for each of JabSok, JabKis, and SntOlj
  • Remove decommissioned mechanical cabinet for dishwasher plumbing to make space for mop/broom hanging location
  • Decide dimensions and materials for mop/broom rack
  • Install outlet box in hallway office

2025-07-31

  • Pack materials for TV47
  • Bus to TV47
  • Validate OSB delivery
  • Cut OSB boards where needed and dry-fit
  • Transfer detailed JabSok/JabKis/SntOlj workflow vision to computer